14 August 2013

Reuters (US): After disaster, the deadliest part of Japan’s nuclear clean‑up

REFILE-INSIGHT-After disaster, the deadliest part of Japan’s nuclear clean-up

Reuters, 14 August 2013, 10:12pm EDT

By Aaron Sheldrick and Antoni Slodkowski

TOKYO, Aug 14 (Reuters) - The operator of Japan’s crippled Fukushima nuclear plant is preparing to remove 400 tonnes of highly irradiated spent fuel from a damaged reactor building, a dangerous operation that has never been attempted before on this scale.

Containing radiation equivalent to 14,000 times the amount released in the atomic bomb attack on Hiroshima 68 years ago, more than 1,300 used fuel rod assemblies packed tightly together need to be removed from a building that is vulnerable to collapse, should another large earthquake hit the area.

Tokyo Electric Power Co (Tepco) is already in a losing battle to stop radioactive water overflowing from another part of the facility, and experts question whether it will be able to pull off the removal of all the assemblies successfully.

“They are going to have difficulty in removing a significant number of the rods,” said Arnie Gundersen, a veteran U.S. nuclear engineer and director of Fairewinds Energy Education, who used to build fuel assemblies.

The operation, beginning this November at the plant’s Reactor No. 4, is fraught with danger, including the possibility of a large release of radiation if a fuel assembly breaks, gets stuck or gets too close to an adjacent bundle, said Gundersen and other nuclear experts.

That could lead to a worse disaster than the March 2011 nuclear crisis at the Fukushima plant, the world’s most serious since Chernobyl in 1986.

No one knows how bad it can get, but independent consultants Mycle Schneider and Antony Froggatt said recently in their World Nuclear Industry Status Report 2013: “Full release from the Unit-4 spent fuel pool, without any containment or control, could cause by far the most serious radiological disaster to date.”

More...